800-662-8670

Cable Remediation

Project Scope: Directional drill/ Trench

Potelco performed the underground civil work necessary to replace underground electrical cable. This work included the following: bored 1-4" from a vault 520 feet to a new 660. Bored 1-4" from the 660 100 feet to a to a pole. Bored 1-4" from the 660 230 feet. Trenched 1-2" 1548 feet off of 1 pole, 4 existing vaults and 1 new 504. Bored 1-4" 175 feet. Bored 1-4" from pole 142 feet to a vault. Bored 1-2" from a vault 98 feet then turn and bored an additional 118 feet to a vault.